Welcome to GCDC official website!

Information

Always pay attention to the global certification trends of wireless products

EMC Testing Process for Electronic Products: From Sample Preparation to Compliance

Edit: GCDC  Affiliation: Certification Information  Views: 110  Release time: 2026-05-15

1 Determine Applicable Standards & Test Scope

EMC standards vary by product type and target market. First, confirm:

Market Regulation Key Standards
EU EMC Directive 2014/30/EU EN 55032 / EN 55035
US FCC Part 15 Subpart B ANSI C63.4 / CISPR 32
China CCC Certification GB/T 9254 / GB/T 17618
Japan VCCI (Voluntary) VCCI V-3 / V-4

Product type also matters: ITE → EN 55032/55035; AV equipment → EN 55013/55020; Household appliances → EN 55014-1/55014-2. Confirm with your test lab.

2 Prepare Samples & Technical Documentation

Proper sample preparation is critical for efficient testing:

Sample Requirements

• Quantity: 1–2 fully functional units

• All accessories and cables included (cable length per standard requirements)

• All operating modes must be demonstrable

Technical Documentation

• Product user manual

• Circuit schematic and PCB layout

• Bill of Materials (BOM) with key component specs

• Product operating principle description

Pre-Testing (Strongly Recommended)

Perform pre-scan before formal testing to identify potential failures early. Pre-testing can be done in-house or at a third-party lab at lower cost.

3 Execute Formal Testing

Formal EMC testing is performed in an accredited laboratory:

EMI Emission Tests

• Conducted Emission (CE): Measure RF disturbance voltage on power ports using LISN in shielded room

• Radiated Emission (RE): Measure radiated field in semi-anechoic chamber or OATS at 3m/10m distance

• Harmonic Currents & Flicker (if applicable): Measure harmonics injected into public mains

EMS Immunity Tests

• ESD: Apply contact/air discharge to enclosure, buttons, connectors

• RS: Expose device to radiated RF field in chamber

• EFT/B, Surge: Apply fast transients and surge waves to power/signal ports

• CS: Inject conducted RF disturbance via coupling clamp/injection probe

Timeline: EMI testing ~2–3 days; full EMS suite ~3–5 days. Remediation cycles add time.

4 Interpret Report & Remediate Failures

The test report is the core compliance document. Key contents:

① Test standards and limit curves

② Measured values at each frequency, margin to limit

③ List of frequencies exceeding limits (if any)

④ Test setup photos, equipment list

⑤ Test conclusion: PASS / FAIL

If failures occur:

  • Analyze failing frequencies: identify if fundamental or harmonic, which circuit module is the source
  • Locate emission source: use near-field probe to scan PCB
  • Implement remediation: add filtering, improve shielding, optimize layout, add decoupling capacitors
  • Verify: re-test modified sample to confirm compliance

5 Obtain Test Report & Certification

After passing all tests, the lab issues a formal test report. Next steps by market:

  • EU (CE): Test report + EU Declaration of Conformity (DoC) — no certificate required
  • US (FCC): Test report + FCC ID grant (via TCB or FCC direct)
  • China (CCC): Test report + CCC certificate (via CQC)
  • Japan (VCCI): Test report + VCCI registration

For more EMC testing services, visit GTG Group.

Common Questions

Q: What is the typical cost of EMC testing?

Costs vary by product type and test scope. EMI testing (CE + RE) typically costs several thousand; full EMS suite adds more. Remediation cycles incur additional cost. Request a quote from an accredited lab.

Q: Does an EMC test report expire?

The test report itself has no fixed expiry date. However, if product design, key components, or manufacturing process change, re-evaluation is required. Some certifications (e.g., CCC) require annual surveillance audits.

Q: Can one test cover multiple markets?

Partially. EN/CISPR-based testing can often support EU, Japan, and other IEC-based markets. FCC and CCC have specific requirements. Choose a lab with multiple accreditations (CNAS, A2LA, etc.) to maximize test data reuse.

This article is generated with AI assistance. Content is for reference only and does not constitute any certification commitment or legal advice.

Contact: net04@gtggroup.com  |  More services: GTG Group

Online Application

Service line 13925591357

*

*

*

*

Please fill in the real information, we will contact you within 24 hours!

Consultation

WeChat

二维码Add Wechat

QQ

QQ consultation

2123664179